Detailed Project Report (DPR) for providing Storm Water Drains for the Thoothukudi

Name of Work- Consultancy for preparation of Detailed Project Report (DPR) for providing Storm Water Drains for the Thoothukudi Municipal Corporation area(90 Sq. Km)

Work completion Date- 27th Nov. 2018

Project Cost- 1110 Crs.

Survey- 

  1. Topographical Survey of 90 SqKm.
  2. Soil Investigation of 90 Trial Pits & Bores.

Description of Work- Study & Analysis of General, Physiography, Rainfall & Climate, Population, Present condition of Storm Water Drain & Need for proposed Storm Water Project, Soil Characteristics, Ground Water Table & Topography, Methodology adopted, Design Parameters, Design Procedure, Statistical information & Present Scenario of Storm Water Drain, Specifications for drains & CD works, Cost of the scheme, Financial pattern of the scheme, Implementation Schedule & phasing of Expenditure, Annual burden.

  1. Topographical Survey of 90 SqKm.
  2. Soil Investigation of 90 Trial Pits & Bores.
  3. Preparation of Contour Drawing.
  4. Rainfall Data analysis for last 35 years.
  5. Design of drainage districts.
  6. Hydraulic Design with StormCAD Bently.
  7. Preparation of Cost Estimates.
  8. Co-ordination with client for Project management Consultancy activities involved Tender Preparation, Social Report, Environment Report.
  9. Preparation of Tender Documents in World Bank Formats.
  10. Presentations at MD & Principal Secretary Level, Tamil Nadu.